| Realization: | 11/2014 - 11/2015 |
|---|---|
| Subject: | Dismantling and construction of structural steel of new bridge |
| Purchaser: | EUROVIA CS |
| Note: | Total length of the bridge 462 m, width: 22.1 m (max. 33.1 m), construction height: 11.3 m, total weight of steel structure: 5650 tons. |

